Well, no handover on Friday (we never expected it anyway), however the past few days have seen a lot of activity around the place.
Plaster, paint, tiles and other things have all been worked on. The toilet has been removed, the Tri-lock installed and loads of other things.
Yesterday (Saturday) we picked up our timber laminate flooring from Fowles and took it to the house, as the painter was there and the place was open.
Broken tiles now replaced. Tiler had to bring some tiles over as the mongrel local kids had broken the ones I set aside
Left over roof tiles - now stored in the garage!
Tiler put the last (missing) tile into the bathroom. At the same time he also tiled the splashback in the pantry (picture coming next time)
Balcony has been sealed in preparation for tiles
Toilet and bin have gone
Gas meter now installed
Hand rail now installed - for the first time since painting...
... but the location of the light switch isn't ideal!
This cornice in bedroom 4 was replaced
Quad beading in place in the al fresco.
More painting needs doing here - or should we say, sanding back, then painting.
Drainage from retaining wall now tied into silt pit
Our flooring being delivered
All 47 boxes!
As the place was open for the past couple of days, we took the opportunity to terminate some wiring and put face plates in. More detail on this coming up on the LexCom Blog (see the link at right).
Labels: electricals, flooring, LexCom, paint, stairs, trilock