So close, but so far away!
Well, no handover on Friday (we never expected it anyway), however the past few days have seen a lot of activity around the place.
Plaster, paint, tiles and other things have all been worked on. The toilet has been removed, the Tri-lock installed and loads of other things.
Yesterday (Saturday) we picked up our timber laminate flooring from Fowles and took it to the house, as the painter was there and the place was open.
More painting needs doing here - or should we say, sanding back, then painting.
Labels: electricals, flooring, LexCom, paint, stairs, trilock